Volt Projects

Power built where it is used.

Community scale solar farms and battery reserves across regional Australia, developed in long term partnership with the people whose land carries them.

What we do

Generation and storage, locally.

From a paddock on the edge of town to the roof above your head, Volt builds power where it is actually used. Volt Projects develops, constructs and operates community scale renewable energy assets in regional Australia, working with farmers, councils and communities on long term land partnerships.

The developer carries the weight. Planning approvals, grid connection, engineering, environmental reports and council conversations sit with Volt, not with the landowner.

One team from the first site visit to the thirtieth year of operation. No handoffs between developer, builder and operator.

What we build

Two assets, one platform.

Aerial view of a utility scale Volt solar farm at golden hour

Volt Solar Farms

Generation. Rows of panels at hip height, hedging around the edges, sheep grazing underneath. The land keeps working while it generates.

Aerial photograph of a Volt Reserve battery storage facility in regional Australian farmland

Volt Reserve

Storage. A battery does not make energy, it saves it. Reserve stores local rooftop solar and releases it back into the homes and businesses that need it when the grid stretches thin.

Panels at hip height, sheep grazing underneath. The land keeps working while it generates.

Scale

Two sizes of project.

A paddock can power the town next door, or help carry a region.

Sub 5MW

Enough to keep the town next door in light.

Land required20 to 35 acres
Homes poweredAround 2,200
Time to build12 to 24 months
Connects toLocal distribution lines
Energy staysIn the local town

Utility

Enough to help carry an entire region.

Land required200 acres and above
Homes poweredTens of thousands
Time to build2 to 4 years
Connects toTransmission network
Usually paired withA Reserve battery

Every site is developed in consultation with the landowner and the immediate neighbours.

For landowners

Built around the farm.

A minimum thirty year lease with an option to extend for a further thirty. Indexed payments through the operating life, and a site that can be returned to exactly what it was.

01

Passive income

A second income that runs alongside the farm, paid quarterly and indexed annually.

02

Climate risk diversified

Steady when the season is not. Independent of weather and commodity cycles.

03

A small footprint

A compact pad, screened by hedging. The vast majority of the land stays in production.

04

Fully reversible

Screw piles rather than concrete footings, so the ground is not permanently altered. Cabling is recovered and batteries are returned to the recycler.

How it works

From first call to operation.

Projects run between twelve months and four years from initial assessment to a constructed, operating asset. There is no obligation through to the option agreement.

01

Initial assessment. Land suitability check, grid proximity analysis and a first conversation. Volt responds within a week with an initial view.

02

Option agreement. Lease terms negotiated, independent legal review, option signed. Once binding it cannot be unilaterally cancelled, so independent advice is encouraged.

03

Planning and grid connection. Environmental assessment, planning consent, grid connection approval and community consultation.

04

Funding and construction. Project finance closed, site preparation, panels and battery storage installed.

05

Operation and income. Commissioning, a thirty year operating life, and regular lease payments throughout.

Community first

Three steps of engagement.

A Volt community engagement session in a regional town hall

Every Volt Projects site is developed in close consultation with the landowner, the immediate neighbours and the wider community. The framework is the same on every project, large or small.

Engage early. Speak to stakeholders and neighbours before decisions are locked in.

Communicate clearly. Open communication through planning, construction and operations, including drop in sessions.

Respond transparently. Concerns answered directly, and contact maintained with the community for the operating life of the project.

Local jobs during construction and operation. Council partnership on projects aligned to local energy targets. The Reserve sits low on a compact pad, screened by hedging and almost invisible from the road.

Where it is up to

Already earning.

01

First agreement executed

The first Development Services Agreement was executed in April 2026, for a 5MW and 20MWh utility scale battery.

02

Contracted work ahead

Development revenue contracted across the next 12 to 18 months, with the pipeline building behind it.

03

Five further projects

Contracts in place for five further sub 5MW development projects, on a non binding basis.

04

First retained asset

A first wholly owned 5MW and 20MWh battery project identified, with construction targeted for the third quarter of 2027.

Track record

Delivered by our founder.

9.2MW

Robinvale Solar Farm. Operating.

34.2MW

Cohuna Solar Farm. Operating.

100MW

Girgarre Solar Farm. Ready to build.

285MW

Corop Solar Farm. 285MW of solar with 704MWh of battery storage. Successful in the 2025 Federal Government Capacity Investment Scheme underwriting, representing a 700 million dollar pipeline underwritten by the Commonwealth.

These projects were developed by Peter Leeson in his capacity at Leeson Group and BNRG Leeson. They are referenced here as evidence of the founder's capability and track record. They are not Volt assets and Volt holds no interest in them.

Project enquiries

Wondering about your land.

Tell us about the site and we will come back with an honest first opinion. No commitment and no pressure.

Please enter your first name.
Please enter your last name.
Please enter a valid email address.
Please tell us where the property is.
Please add a short message.

Your enquiry has been sent.

Thank you. Someone from the developments team will respond directly.

More detail for landowners, including frequently asked questions on leases and land criteria, is on voltprojects.com.au